search the IfM or University web pages an A to Z list of page content and information on this site
IfM logo Institute for Manufacturing link to the University of Cambridge home page
Dept of Engineering
IfM Home
about IfM
News
Address / directions
People
Research
Education
Vacancies
Work with IfM
Events & courses
Books
Local

IfM new facilities

an early draft site plan
an early draft site plan

Work in progress - April 2008

Click on a picture to get a larger version

the main entrance (where all the men are)
the main entrance (where all the men are)

Looking over the main entrance to the floor of the ILU, MET and ISMM offices area
Looking over the main entrance to the floor of the ILU, MET and ISMM offices area

Reception corridor waiting for concrete
Reception corridor waiting for concrete.

Project room and study room floor slab
Project room and study room floor slab

DIAL lab floor reinforcing steelwork
DIAL lab floor reinforcing steelwork

Steel reinforcing for Lecture rooms 1 and 2
Steel reinforcing for Lecture rooms 1 and 2

Shuttering over the project room and study room
Shuttering over the project room and study room.

Pouring slab
Shuttering over lecture rooms 1 and 2

 


a-z site index | about the IfM | the Institute for Manufacturing is a part of the Department of Engineering | Go to top of page

This page is from the Institute for Manufacturing, Department of Engineering, University of Cambridge
www.ifm.eng.cam.ac.uk